Aereo Cloud for Open Pit Mines

Accelerated short-term reconciliation.

AI-powered, short-interval reconciliation of actuals against plan, enabling precise short-term mine planning and timely operational decisions.

Aereo Cloud turns drone photogrammetry and aerial or terrestrial LiDAR survey data into production reconciliation insights by bench, zone and site. Compare surveyed volumes with targets, cross-check stockyard quantities where records are available, and provide current ground data for your next plan, every survey cycle.

Annotated mine showing bench face advancement, excavated pit versus plan and overburden dump versus plan
Volumetric Accuracy
~99%subject to survey quality and validation conditions
Turnaround at Scale
Up to 600 haprocessed and delivered within 24 hours, depending on dataset size, processing configuration and the analyses required
Survey Experience
770,000+ haacross 3,700+ documented mine surveys

Trusted by leading mining companies worldwide

  • JSW
  • Hindustan Zinc
  • UltraTech Cement
  • MOIL Limited
  • Tata Steel
  • Government of Telangana
  • Coal India
  • Adani

What Production Reconciliation Covers

Excavations, dumping, stockpiles and reporting, in one view.

Production reconciliation is not one number. Aereo Cloud answers five connected questions from every survey: what was excavated, how the dumps grew, how much the stocks moved, what the next plan needs, and how it all gets reported.

Know How Much Material Moved, Where, and Against Which Target.

Area status shows where work happened. Quantity variance shows whether it met the target.

  • Compare planned and surveyed overburden and ore volumes by bench, zone and period
  • Review composite volumes against targets on one dashboard
  • Identify planned areas with activity, planned areas without activity, and activity outside planned areas
  • Compare the surveyed working area with the planned boundary

Outcome

Traceable surveyed volumes against the production plan, by bench, zone and site, for planning, operations and finance teams.

Planned and actual excavation areas and deviations on the mine survey

Planned area

Actual working area

Outside plan

Cross-Check Pit Quantities Against Dump, Stockyard and Dispatch Records.

Cross-checks run where compatible dump, stockyard and dispatch records are available for the same reporting period.

  • Cross-check pit excavation against surveyed overburden or waste dump additions and stockyard records
  • Compare excavated ore quantities with stockyard and dispatch records where available
  • Validate contractor-reported quantities against surveyed volumes

Outcome

Identify geo-referenced quantity differences across pit, dump, stockyard and dispatch records for your team to investigate.

Start the Next Short-Term Plan From the Ground You Surveyed.

  • Export current bench positions, contours, terrain models and deviation layers to your mine planning software, including Datamine
  • Provide remaining planned excavation quantities by zone for recovery planning
  • Compare actual excavation locations with planned ore-body sections

Outcome

Updated terrain and deviation insights for your planning team to revise and approve the next plan.

Terrain model with bench positions and planning export layers

inputs for the next plan

Export Layer

Coordinate system

Review the Number and the Survey Behind It.

  • Generate periodic reconciliation reports from the processed survey data
  • Share deviation maps, cross-sections and elevation profiles
  • Review production against targets by mine, bench, zone, contractor and period
  • Trace reported volumes to the survey, boundary and calculation
  • Keep surveys and reconciliations in one repository for periodic trend analysis

Outcome

One traceable record of surveyed production volumes for planning, operations and finance teams.

Mine compliance elevation profile and deviation report traceable to the source survey

Why Aereo Cloud

One Georeferenced Record of What Moved, Where and When.

Conventional reconciliation overlays two surfaces and compares them by hand in CAD or GIS. Aereo Cloud links every surveyed volume to its location, mine-defined material zone and survey period, so your teams investigate deviations and prepare the next plan from the same record.

AI-Detected Mine Features

AI identifies bench crests and toes in processed survey data; geometry calculations then measure the volumes.

AI-Detected Mine Features — survey visualization

Quantity, Location and Period Together

Trace each reported volume to its working zone and survey period.

Quantity, Location and Period Together — survey visualization

EXCAVATION 01 · SURVEY S12

HEAP

VOLUME NET(m³)

WEIGHT NET(T)

ZONE

PERIOD

Heap 12

2,197

5,494

Zone B

S11 → S12

Heap 13

5,170

12,926

Zone B

S11 → S12

Heap 17

1,348

3,370

Zone C

S11 → S12

Mine-Defined Material Zones

Calculate volumes using ore, waste and composite boundaries defined or validated by your mine team.

Mine-Defined Material Zones — survey visualization

material zones · defined by mine team

Waste · Overburden

Ore

Volume calculated per zone

Deviations on the Map

Locate inactive planned areas, activity outside the plan, and quantities above or below target.

Deviations on the Map — survey visualization

Validated Against Production Records

~99% accuracy across 100+ validation assessments against weighbridge, belt-scale and plant-feed records.

Validated Against Production Records — survey visualization

validation · period s12

Survey volume

51,200 m³

Weighbridge records

50,740 m³

Difference

0.9%

~99% accuracy across 100+ validation assessments

Inputs for Your Planning Tools

Export current terrain, bench positions and deviation layers for your planning team to use.

Inputs for Your Planning Tools — survey visualization

Graph viewer

Export to planning

Elevation (m)

Distance (m)

GB_ITR_06

How It Works

From Approved Design to Corrective Action, Every Survey Cycle.

Aereo Cloud connects approved designs, current surveys, AI-extracted site geometry and measured deviations in one repeatable workflow. Engineers validate the findings and decide the actions, and each new survey gives a fresh check and updated inputs for mine planning.

01 – Plan

Set the Production Plan and Targets

Bring in planned excavation and dumping targets by bench, zone, material and period. This is the baseline every later stage compares against.

Step 1 of 7

Aereo Go

Take reconciliation insights into the field.

Open project and reconciliation layers on your phone. Capture field observations in Aereo Go and share them with office teams through Aereo Cloud.

Explore Aereo Go
Aereo Go — view and navigate survey imagery and feature layersAereo Go — record a polygon field observation on the survey map

Outputs and Integrations

The deviation goes back to where the next plan is built.

Standard Formats · In

Your Plan, in Your Formats.

Import compatible mine design and production-plan files

Supported formats such as DXF and SHP

Standard Formats · Out

Current Ground and Deviations, Ready to Plan On.

Current bench positions, contours and terrain surfaces

Remaining planned excavation quantities by zone

Deviation polygons and face-advancement layers

What Teams Get

Use supported formats such as DXF and SHP

Datamine and Enterprise Workflows

Into the Tools Your Teams Already Use.

Export spatial data for compatible mine planning, CAD and GIS tools

Transfer supported outputs to Datamine through the Aereo Cloud connector

Share project information with field teams through workspace links and Aereo Go

What That Changes

Give your planning team current surveyed ground and remaining excavation quantities for the next planning review.

Book a demo

Decision Layers

Reconciliation Intelligence for Every Decision Layer.

Give leadership, planning, operations and survey teams a shared view of production against plan.

LeadershipVP Mining · Head of Mining · General ManagerSee where production is ahead of or behind plan.
  • Actual versus planned volumes across mines, zones and reporting periods
  • Remaining planned quantities and production trends
  • A consistent basis for discussing performance and recovery priorities
Planning and production managersStart the next planning review with current ground data.
  • Review current bench positions, terrain models and remaining planned quantities
  • Export deviation layers to your mine planning tools
  • Revise and approve the next production plan
Site operationsLocate production gaps and prioritise follow-up.
  • Find planned zones without activity and work outside the plan
  • Review quantity differences by bench, zone and period
  • Share field observations in the same site context
Survey and Technical TeamsProduce repeatable, traceable volumes by zone and period.
  • Validate ore, waste and composite boundaries
  • Measure cut, fill and net volume changes from each survey
  • Trace reported quantities to the survey, boundary and calculation

Works Alongside

Use the Same Survey Across Connected Mining Workflows.

A Common Geospatial Foundation for Every Capability

Did we build the mine as designed?

Excavation, dumps, haul roads and drainage checked against the approved mine design, every survey cycle.

Explore Design Compliance

Are physical conditions creating operational risks?

Haul roads, drainage paths and slopes checked for conditions that need a closer look.

Explore Mine Safety

Customer Stories

Teams reconciling production with Aereo Cloud.

“...Aereo’s drone-based mapping, volume surveys, and analytics delivered at scale through their cloud platform have helped us achieve accuracy, scalability, and efficiency across our operations.”

Piyush Srivastava, Chief NRD, Tata Steel

FAQ

Frequently asked questions

What does Aereo Cloud reconcile?

Aereo Cloud compares surveyed excavation and dumping volumes, and where the work happened, with the production plan for the same period. Where compatible records are available, it also cross-checks them against dump, stockyard and dispatch data.

How is production reconciliation different from comparing two surveys?

Two surveys show how the ground changed between their dates. Production reconciliation checks that change against the production targets for the same period.

How does production reconciliation relate to design compliance?

Production reconciliation checks quantities and working locations against the production plan, while design compliance checks the mine against its approved design. A mine can meet its production target and still deviate from its design.

Does Aereo Cloud replace mine planning software?

No. Aereo Cloud provides current ground, surveyed volumes and deviation layers as inputs for planning, and your planning team builds and approves the plan in its own software.

Does Aereo Cloud replace the end-of-period surveyor report?

It removes most of the manual work behind the report. Volumes, maps and reports come from one processed survey that your team validates, so reporting can move to weekly where survey frequency allows.

Does Aereo Cloud export to mine planning software?

Yes. Terrain and deviation layers export as SHP, GeoJSON, DXF, KML, TIFF or CSV for planning, CAD and GIS tools, and supported outputs transfer to Datamine through the Aereo Cloud connector.

How is volumetric accuracy validated?

Aereo Cloud has shown ~99% volumetric accuracy across 100+ validation assessments against weighbridge, belt-scale and plant-feed records. Accuracy depends on survey quality and validation conditions.

Does Aereo Cloud classify ore and waste, or measure grade?

No. Your mine team defines or validates ore, waste and composite boundaries, and Aereo Cloud calculates the volumes within them.

How quickly are reconciliation outputs available?

Aereo Cloud processes and delivers up to 600 ha within 24 hours, depending on dataset size, processing configuration and the analyses required.

GET STARTED

See how production reconciliation would work for your mine.

Explore plan-versus-actual comparisons, reporting and planning outputs with our team.