▲Aereo Cloud for Open Pit Mines
Accelerated short-term reconciliation.
AI-powered, short-interval reconciliation of actuals against plan, enabling precise short-term mine planning and timely operational decisions.
Aereo Cloud turns drone photogrammetry and aerial or terrestrial LiDAR survey data into production reconciliation insights by bench, zone and site. Compare surveyed volumes with targets, cross-check stockyard quantities where records are available, and provide current ground data for your next plan, every survey cycle.
- Volumetric Accuracy
- ~99%subject to survey quality and validation conditions
- Turnaround at Scale
- Up to 600 haprocessed and delivered within 24 hours, depending on dataset size, processing configuration and the analyses required
- Survey Experience
- 770,000+ haacross 3,700+ documented mine surveys
Trusted by leading mining companies worldwide
MOIL LIMITED
▲What Production Reconciliation Covers
Excavations, dumping, stockpiles and reporting, in one view.
Production reconciliation is not one number. Aereo Cloud answers five connected questions from every survey: what was excavated, how the dumps grew, how much the stocks moved, what the next plan needs, and how it all gets reported.
Know How Much Material Moved, Where, and Against Which Target.
Area status shows where work happened. Quantity variance shows whether it met the target.
- Compare planned and surveyed overburden and ore volumes by bench, zone and period
- Review composite volumes against targets on one dashboard
- Identify planned areas with activity, planned areas without activity, and activity outside planned areas
- Compare the surveyed working area with the planned boundary
Outcome
Traceable surveyed volumes against the production plan, by bench, zone and site, for planning, operations and finance teams.
Planned area
Actual working area
Outside plan
Cross-Check Pit Quantities Against Dump, Stockyard and Dispatch Records.
Cross-checks run where compatible dump, stockyard and dispatch records are available for the same reporting period.
- Cross-check pit excavation against surveyed overburden or waste dump additions and stockyard records
- Compare excavated ore quantities with stockyard and dispatch records where available
- Validate contractor-reported quantities against surveyed volumes
Outcome
Identify geo-referenced quantity differences across pit, dump, stockyard and dispatch records for your team to investigate.
ob dump addition
Volume (m³)
Cut
85979.30
Fill
225.43
Net
85753.87
Weight (tonnes)
Cut
180556.52
Fill
473.39
Net
180083.12

Stockyard · Survey S12
Start the Next Short-Term Plan From the Ground You Surveyed.
- Export current bench positions, contours, terrain models and deviation layers to your mine planning software, including Datamine
- Provide remaining planned excavation quantities by zone for recovery planning
- Compare actual excavation locations with planned ore-body sections
Outcome
Updated terrain and deviation insights for your planning team to revise and approve the next plan.
inputs for the next plan
Export Layer
Coordinate system
Review the Number and the Survey Behind It.
- Generate periodic reconciliation reports from the processed survey data
- Share deviation maps, cross-sections and elevation profiles
- Review production against targets by mine, bench, zone, contractor and period
- Trace reported volumes to the survey, boundary and calculation
- Keep surveys and reconciliations in one repository for periodic trend analysis
Outcome
One traceable record of surveyed production volumes for planning, operations and finance teams.
▲Why Aereo Cloud
One Georeferenced Record of What Moved, Where and When.
Conventional reconciliation overlays two surfaces and compares them by hand in CAD or GIS. Aereo Cloud links every surveyed volume to its location, mine-defined material zone and survey period, so your teams investigate deviations and prepare the next plan from the same record.
AI-Detected Mine Features
AI identifies bench crests and toes in processed survey data; geometry calculations then measure the volumes.
Quantity, Location and Period Together
Trace each reported volume to its working zone and survey period.
EXCAVATION 01 · SURVEY S12
HEAP
VOLUME NET(m³)
WEIGHT NET(T)
ZONE
PERIOD
Heap 12
2,197
5,494
Zone B
S11 → S12
Heap 13
5,170
12,926
Zone B
S11 → S12
Heap 17
1,348
3,370
Zone C
S11 → S12
Mine-Defined Material Zones
Calculate volumes using ore, waste and composite boundaries defined or validated by your mine team.
material zones · defined by mine team
Waste · Overburden
Ore
Volume calculated per zone
Deviations on the Map
Locate inactive planned areas, activity outside the plan, and quantities above or below target.
Validated Against Production Records
~99% accuracy across 100+ validation assessments against weighbridge, belt-scale and plant-feed records.
validation · period s12
Survey volume
51,200 m³
Weighbridge records
50,740 m³
Difference
0.9%
~99% accuracy across 100+ validation assessments
Inputs for Your Planning Tools
Export current terrain, bench positions and deviation layers for your planning team to use.
Graph viewer
Export to planning
Elevation (m)
Distance (m)
GB_ITR_06
▲How It Works
From Approved Design to Corrective Action, Every Survey Cycle.
Aereo Cloud connects approved designs, current surveys, AI-extracted site geometry and measured deviations in one repeatable workflow. Engineers validate the findings and decide the actions, and each new survey gives a fresh check and updated inputs for mine planning.
01 – Plan
Set the Production Plan and Targets
Bring in planned excavation and dumping targets by bench, zone, material and period. This is the baseline every later stage compares against.
02 – Survey
Capture and Process Survey Data
Process drone photogrammetry, aerial or terrestrial LiDAR, and other supported survey inputs into the terrain models and spatial layers needed for reconciliation.
03 – Extract
Calculate Surveyed Volumes
AI identifies bench crests and toes. Your engineers define or validate ore, waste and composite boundaries. Geometry calculations then measure cut, fill and net volume changes by bench, zone and period.
04 – Compare
Compare the Plan With Surveyed Results
Compare planned and surveyed quantities and working locations for the same period. Classify zones as planned-active, planned-inactive or unplanned-active.
05 – Deviations
Locate Production Deviations
Map planned areas without activity, activity outside the plan, and over- or under-excavation within active planned areas. Review the differences against production targets.
06 – Validate
Validate and Report
Cross-check surveyed quantities with compatible dump, stockyard and dispatch records where available, and validate the results. Share reconciliation dashboards, maps and period reports from the same survey dataset.
07 – Act
Use the Outputs to Replan
Export current terrain, bench positions, remaining planned quantities and deviation layers to your mine planning software, including Datamine. Your planning team revises and approves the next plan.
Step 1 of 7
▲Aereo Go
Take reconciliation insights into the field.
Open project and reconciliation layers on your phone. Capture field observations in Aereo Go and share them with office teams through Aereo Cloud.
Explore Aereo Go →

▲Outputs and Integrations
The deviation goes back to where the next plan is built.
Standard Formats · In
Your Plan, in Your Formats.
Import compatible mine design and production-plan files
Supported formats such as DXF and SHP
Standard Formats · Out
Current Ground and Deviations, Ready to Plan On.
Current bench positions, contours and terrain surfaces
Remaining planned excavation quantities by zone
Deviation polygons and face-advancement layers
What Teams Get
Use supported formats such as DXF and SHP
Datamine and Enterprise Workflows
Into the Tools Your Teams Already Use.
Export spatial data for compatible mine planning, CAD and GIS tools
Transfer supported outputs to Datamine through the Aereo Cloud connector
Share project information with field teams through workspace links and Aereo Go
▲What That Changes
Give your planning team current surveyed ground and remaining excavation quantities for the next planning review.
▲Decision Layers
Reconciliation Intelligence for Every Decision Layer.
Give leadership, planning, operations and survey teams a shared view of production against plan.
01LeadershipVP Mining · Head of Mining · General ManagerSee where production is ahead of or behind plan.
- Actual versus planned volumes across mines, zones and reporting periods
- Remaining planned quantities and production trends
- A consistent basis for discussing performance and recovery priorities
02Planning and production managersStart the next planning review with current ground data.
- Review current bench positions, terrain models and remaining planned quantities
- Export deviation layers to your mine planning tools
- Revise and approve the next production plan
03Site operationsLocate production gaps and prioritise follow-up.
- Find planned zones without activity and work outside the plan
- Review quantity differences by bench, zone and period
- Share field observations in the same site context
04Survey and Technical TeamsProduce repeatable, traceable volumes by zone and period.
- Validate ore, waste and composite boundaries
- Measure cut, fill and net volume changes from each survey
- Trace reported quantities to the survey, boundary and calculation
▲Works Alongside
Use the Same Survey Across Connected Mining Workflows.
A Common Geospatial Foundation for Every Capability
Did we build the mine as designed?
Excavation, dumps, haul roads and drainage checked against the approved mine design, every survey cycle.
Explore Design Compliance →What needs attention next?
Haul roads, benches, dumps and inspection evidence in one operating view.
Explore Operational Control →Are physical conditions creating operational risks?
Haul roads, drainage paths and slopes checked for conditions that need a closer look.
Explore Mine Safety →▲Customer Stories
Teams reconciling production with Aereo Cloud.
Tata Steel
Jharkhand and Odisha, India
Coal India Limited
India
“...Aereo’s drone-based mapping, volume surveys, and analytics delivered at scale through their cloud platform have helped us achieve accuracy, scalability, and efficiency across our operations.”
▲FAQ
Frequently asked questions
What does Aereo Cloud reconcile?
Aereo Cloud compares surveyed excavation and dumping volumes, and where the work happened, with the production plan for the same period. Where compatible records are available, it also cross-checks them against dump, stockyard and dispatch data.
How is production reconciliation different from comparing two surveys?
Two surveys show how the ground changed between their dates. Production reconciliation checks that change against the production targets for the same period.
How does production reconciliation relate to design compliance?
Production reconciliation checks quantities and working locations against the production plan, while design compliance checks the mine against its approved design. A mine can meet its production target and still deviate from its design.
Does Aereo Cloud replace mine planning software?
No. Aereo Cloud provides current ground, surveyed volumes and deviation layers as inputs for planning, and your planning team builds and approves the plan in its own software.
Does Aereo Cloud replace the end-of-period surveyor report?
It removes most of the manual work behind the report. Volumes, maps and reports come from one processed survey that your team validates, so reporting can move to weekly where survey frequency allows.
Does Aereo Cloud export to mine planning software?
Yes. Terrain and deviation layers export as SHP, GeoJSON, DXF, KML, TIFF or CSV for planning, CAD and GIS tools, and supported outputs transfer to Datamine through the Aereo Cloud connector.
How is volumetric accuracy validated?
Aereo Cloud has shown ~99% volumetric accuracy across 100+ validation assessments against weighbridge, belt-scale and plant-feed records. Accuracy depends on survey quality and validation conditions.
Does Aereo Cloud classify ore and waste, or measure grade?
No. Your mine team defines or validates ore, waste and composite boundaries, and Aereo Cloud calculates the volumes within them.
How quickly are reconciliation outputs available?
Aereo Cloud processes and delivers up to 600 ha within 24 hours, depending on dataset size, processing configuration and the analyses required.
See how production reconciliation would work for your mine.
Explore plan-versus-actual comparisons, reporting and planning outputs with our team.